Building Dreams
Green Building Council
Current Projects
Residential Commercial
Back
Aura BiplexAura BiplexAura BiplexAura BiplexAura BiplexAura Biplex Aura BiplexAura BiplexAura BiplexAura Biplex
Aura Biplex

Habitat is the 19 Storey Luxurious Residential Wing of Aura Biplex offering Premium 3BHK and 4BHK Residences. The aesthetically designed and innovatively constructed Wing “Habitat” has all that can create a perfect fusion of Luxurious Living and Elegant Lifestyle with ultra-modern amenities and world class facilities giving a new meaning to life.

Habitat - Salient Features

  • Luxurious 3 | 4 BHK Residences
  • Residences begin only from 3rd Floor onwards
  • Ample Car Parking Space
  • Aesthetical planning as per Vastu Norms
  • IGBC Green Homes Registered Project
  • Earthquake Resistant R.C.C. Frame
  • Separate Entry and Exit for Commercial and Residential wings
  • Grand Entrance Lobby with Waiting Longue
  • 4 High- Speed Elevators
  • Vehicle Free 2nd Level dedicated to State-of-the- Art Gymnasium | Swimming Pool | Landscaped Garden | Children's Play Area
  • Generator backup for lift and common areas
  • 3- Tier Security System
  • Rain Water Harvesting
  • Sewerage Treatment Plant
  • Fire Fighting System

Inside Flat Amenities

  • Imported Marble in Living Room, Wooden Flooring in Master Bedroom and Vitrified Tiles Flooring
    in other Bedrooms.
  • 3.1 meters Floor to Floor Height
  • Veneer Finish main Entrance Door
  • Internal walls furnished with POP / Gypsum and Acrylic Paint
  • Kitchen with Granite Platform / S.S. Sink / Glazed Wall Tiles up to 7' height / Water Purifier /
    Piped Gas Line Connection
  • Living room and all bedrooms with concealed copper Wiring / Adequate Electrical Points / Modular Switches / Flush Doors / Anodized French Windows / TV and Telephone Cable Outlets / Internet Connection Provision
  • Toilets with Flush Door / Designer Tiles / Sanitary Ware of reputed make / Geysers
  • Intercom and Video Door Phone System in each residence.
Green Building Council Joint Venture Of Bhommi -Nilkamal
Senate (Commercial Wing)     Habitat (Residential Wing)

Flip - Brochure

PDF - Brochure

AuraBiplex Senate Brochure AuraBiplex Senate Brochure

Work Progress

Work in Progress - Work Completed as on August 2013.

 

All Slabs Completed (22 Slabs) Casted.

All Slabs Completed (22 Slabs). All Slabs Completed (22 Slabs). All Slabs Completed (22 Slabs).

Brick Work Completed All Levels.

Brick Work Completed All Levels. Brick Work Completed All Levels. Brick Work Completed All Levels.

Plaster work completed upto 17th Level.

Plaster work completed upto 17th Level Plaster work completed upto 17th Level Plaster work completed upto 17th Level
 

Work in Progress - 15th Floor Slab Completed as on 5th June 2013.

   
 

Work in Progress - 8th Floor Slab Completed as on March 2013

 

Basement Work - July 2012

Views

     

Sample Flat

Click for 360o View  
Living Room Living Room Living Room
     
Dining Table Dining Table Dining Table
     
Dining Table Dining Table Living Room
     
Living Room Kitchen Room Kitchen Room
     
Kitchen Room Kitchen Room Bed Room
     
Bed Room Bed Room Bed Room
     
Bed Room Bed Room Bed Room
     
Bed Room Bed Room Bed Room